Kitchen Installation & Project Coordination

What’s included in our kitchen design & installation service

How our kitchen installation process works

Free site survey

We visit, measure, and listen. No obligation – just a clear understanding of your space and brief.

Design & quote

You receive a layout plan, finish options, and a fully itemised fixed-price quote within 2 working days.

Materials ordered

We handle procurement directly from trade suppliers – often saving 20–30% vs. high street retail.

Installation

A dedicated team handles strip-out, fitting, plumbing, electrics, tiling, and decoration – all coordinated.

Handover & aftercare

Full snagging walk-through, written warranty, and ongoing maintenance available from the same company.

Who we work with

Homeowners

Designing or renovating a kitchen in your primary residence – from a practical update to a full open-plan transformation.

Landlords & investors

Fast-turnaround kitchen installations that improve rental yield and reduce void periods – with minimal disruption to tenants.

Property developers

Volume kitchen packages for residential developments, with consistent specification and reliable programme delivery.

Estate & letting agents

Trusted contractor relationships for kitchen refurbishments between tenancies – handled swiftly and reported clearly.

Frequently asked questions

What does a full property refurbishment include?

A full property refurbishment covers every trade required to take a property from its current condition to a fully finished, move-in ready state. This includes strip-out and clearance, structural works if required, full rewiring, replumbing, kitchen and bathroom installation, plastering, flooring, carpentry, and decoration — all coordinated and managed by a single point of contact.

How long does a full refurbishment take in London?

A flat refurbishment typically takes 6–14 weeks on site; a full house refurbishment 12–24 weeks. Projects with structural changes or period complications may run longer. We provide a firm timeline in your quote.

Do I need to vacate during the work?

For a full refurbishment involving rewiring, replumbing, or kitchen and bathroom strip-out, vacating is recommended. It allows work to proceed faster and at lower cost. We advise on this at the survey stage.

Do you work with landlords on void refurbishments?

Yes — void refurbishments are a core part of our work. We prioritise fast mobilisation and efficient sequencing so landlords can re-let as quickly as possible.

Can you manage a refurbishment if I’m based overseas?

Yes — we regularly work with overseas clients. We provide regular photo updates, video calls at key stages, and a single point of contact throughout. You do not need to be present on site at any point during the project.

Do I need planning permission?

Internal refurbishments — rewiring, replumbing, kitchens, bathrooms, and decoration — don’t typically require planning permission. Extensions, loft conversions, and structural changes may need building regulations approval. Listed buildings and conservation areas have additional requirements. We assess this at the survey.

Ready to Transform Your Kitchen?

Tell us what you need – we’ll arrange a site visit, understand your requirements, and provide a clear, fixed-price quote.

Tel. 020 3601 2356

Mob. 074 1568 2276